Chillesford Lodge Phase 2

  • Client Chillesford Lodge Estate
  • Location Chillesford, Woodbridge
  • Project Status Completed June 2018
  • Architect Feilden & Mawson
  • Consultant Performance Specification John Slater & Haward & Brook Electrical Design & Build
  • Main Contractor Robert Norman Construction
  • Scope of Work The complete refurbishment of existing redundant farm buildings into contemporary 4-executive style houses with an indoor swimming pool for private use by the residents.

About the project

Brook Electrical installed lighting, power, smoke detection and TV distribution systems within each domestic property. All properties supplied from a Ryefield Distribution Board in a central plant room within the housing development . The TV distribution system to each property is linked via fibre back to a central satellite dish

Brook Electrical installed lighting and power within the swimming pool and changing rooms.

Brook Electrical installed a fire alarm and intruder alarms system within the swimming pool complex.

Brook Electrical designed and installed the control systems for the heating/hot water & pool heating within the swimming pool plant room.

Brook Electrical re wired and replaced the existing supplies to various existing buildings on the estate, originally wired direct from UK Power Networks, back to a new central Ryefield distribution system within the swimming pool electrical intake cupboard.