New Grundisburgh Village Hall

  • Client Grundisburgh Village Hall Committee
  • Location Grundisburgh, Suffolk
  • Project Status Completed January 2022
  • Architect Last & Tricker Partnership
  • Consultant Brook Electrical Design & Build
  • Main Contractor DAB Group Ltd
  • Scope of Work A new village hall

About the project

A design and build project encompassing Lighting and Power, Intruder alarm system, data network, fire alarms, Nu Heat underfloor heating.

Brook Electrical installed lighting, power, and TV distribution system as well as a small data network throughout the hall.

Brook Electrical installed a fire alarm and intruder alarm systems.

Brook Electrical worked in conjunction with the mechanical sub-contractor as regards the Nu Heat system and air source heat pumps.

A design and build project encompassing Lighting and Power, Intruder alarm system, data network, fire alarms, Nu Heat underfloor heating